08-03-2010 mv.Tucana loaded 2 heavy pieces

After discharging in the Eemshaven, mv Tucana shifted to Delfzijl for her next cargo.
Content of this cargo where 2 heavy pieces, 100mt and 89mt.
It was delivered by barge, ms Concordia, she had loaded the cargo at Barlage GmbH in Haren / Ems, Germany.

This two heavy pieces, canalparts for Electric Power Plant  was loaded underdeck’s into the Tucana.
After lashing and securing, the Tucana left Delfzijl with destination Wilhelmshaven, Germany.
Loading, lashing / securing / sailing and discharging in 24 hours.